Complete Design and Execution of the following list of scope of works including acquisition of all required NOC from different local authorities (DEWA, RTA, DM DDA, DCD, Etisalat/Du, SIRA, EIAC and others) for the complete Central Park and Malibu Bay in Damac Hills 2 with Total Landscape Area of 280,000m2.
More than 65,000 m2 of hardscape area
5 Kms of Pedestrian Pathway
More than 90,000 m2 of soft landscape area including natural & artificial grass
Around 2,750 nos. of Palm & trees
Boating deck, beach entry to pond, café building, and others
Outdoor Cinema screen in the Lagoon
Complete Audio Video System including movable lighting system
Complete Signages and Way Finding
Landscape Furniture – around 700 Nos (Benches, Litter Bins, Bicycle Rack, Dog Waste Bin, Coal Waste Bin, Tables, Towel Stations, Life-Guard Station, Inflatable Ring, Safety Ring/ Life Buoy, Cabanas, Sun Loungers)
Floating fountains (5 nos.) for TSE Lagoons aeration system
CLIENT | Damac |
YEAR | . |
WE DID | Complete Landscape Area (20,000m2) |
Services | WATER BODIES & LANDSCAPING WORKS |